- Services
- Industries
- Automotive
- Battery
- Building inspection
- Fire alarms system testing
- Household appliances
- Installation materials
- Industrial machinery
- IT & audio video
- Laboratory, test & measurement
- Lighting equipment
- Maritime, oil & gas
- Medical & healthcare equipment
- Military & aerospace product testing
- Wireless & telecom
- Resources
- About
- Blog
- Events
October 1, 2022
Preparing for eco-design and energy labelling of phones and tablets
Written by: Nemko
Some150 million mobile phones and 25 million tablets were during 2020 registered sold in Europe, while almost 700 million units were kept at home in hibernation.
So there is a huge eco-design potential of proper reuse, green mining and proper disposal of the hazardous substances involved.
EU’s Circular Economy Action Plan from 2020 calls for such products to be:
-Energy Efficient
-Durable
-Fit for maintenance repair and upgrading throughout lifetime
-Able to reuse and recycle at the end of life
In May this year, as mandated under the Energy-Related Products Directive (ErP Directive 2009/125/EC),the European Commission published for comments a draft of regulations with requirements for both eco-design and energy labelling of smartphones and tablets.
Now, after some months of preparation and consultation, they have officially published a new draft for this.The new draft is more concrete, such as concerning energy efficiency:
- Battery should be either replaceable or proofed to withstand 1000 charge/discharge cycle and still keep at least 80% of initial capacity.
- Fast charging should be ‘OFF’ in default setting.
- Energy label with efficiency, battery endurance per cycle, IP class, and free fall reliability class.
It is further noted that
- Reparability class (A to E) is to be included in the energy label.
- Smartphones and tablet are expected to be energy labelled in the market no later than February 2024.
- Environmental footprint is not included now but will be under consideration until the intended revision after 3 years.
- Smart wearables may be included in the planned revision after 3 years
The new draft currently undergoes a 4 week’s consultation process. When finalized and approved, the new regulations shall enter into force 3 weeks after publication in EU’s Official Journal, while there will be 3 stages of implementation: after 12 months, 14 months and 18 months.
For further information and assistance with understanding these new requirements, please contact Kenny.Ho@nemko.com
(Article is based on text provided by Kenny Ho, edited by T.Sollie)